Introduction to maintenance of ground rails:
1.In order to avoid deformation of the ground rail,when lifting the ground rail,four steel wire ropes of the same length should be used to hang the four lifting holes on the ground rail,and the ground rail should be smoothly lifted on the transportation object.
2.Pad and level the ground rail support points,ensuring that each support point receives equal force and the entire ground rail is stable.
3.When the ground rail is not necessary,the task surface should be cleaned in real time,then coated with a layer of anti rust oil and covered with anti rust paper.
4.The ground track should be installed in a ventilated and dry environment,away from heat sources,corrosive gases,and corrosive liquids.
5.The ground track is subject to regular weekly inspections in accordance with national standards,and the verification period can be 6-12 months based on detailed conditions.
6.When installing the ground rail,the various support points of the ground rail should be padded and compacted with adjusting shims,and the ground rail should be adjusted to a qualified accuracy by skilled personnel.
7.In order to avoid complete deformation of the ground rail,after use,the workpiece should be removed from the ground rail to prevent deformation caused by long-term heavy pressure on the ground rail.
Model and specifications of the basic groove iron:
T-shaped groove ground rail specifications and models | |||
1500×150×150 | 1500×200×150 | 1500×250×300 | 1500×300×400 |
2000×200×300 | 2000×250×300 | 2000×300×350 | 2000×350×350 |
2500×200×300 | 2500×250×300 | 2500×300×350 | 2500×300×400 |
2750×200×300 | 2750×250×300 | 2750×300×350 | 2750×300×400 |
3000×300×300 | 3000×300×350 | 3000×300×400 | 3000×320×400 |
3200×300×300 | 3200×300×350 | 3200×300×400 | 3200×320×400 |
3500×300×300 | 3500×300×350 | 3500×300×400 | 3500×320×400 |
4000×300×300 | 4000×300×350 | 3500×300×400 | 4000×320×400 |
4500×300×350 | 4500×300×400 | 4500×320×400 | 4500×350×400 |
5000×300×400 | 5000×350×400 | 5000×400×450 |
-
Production process and processing flow of granite platform
2024-01-23 02:53:29
-
Precautions for granite component assembly
2024-01-23 02:52:56
-
What is the error of granite platform
2024-01-23 02:52:36
-
Operation specification and maintenance of granite platform
2024-01-23 02:51:58
-
Precautions for granite components
2024-01-23 02:51:20
Address: East Development Zone, Jiaohe Town, Botou City, Hebei Province
Email:hygge@weiyuemachinery.com Whatsapp:+86 13785722307 Phone:+86 13785722307
Email:richelle@weiyuemachinery.com Whatsapp:+86 13785751720 Phone:+86 13785751720
Email:isabella@weiyuemachinery.com Whatsapp:+86 13780573715 Phone:+86 13780573715
Email:alice@weiyuemachinery.com Whatsapp:+86 13513036051 Phone:+86 13513036051
Tel:+86-400-7659-868 Tel:+86-0317-2081839 Fax:+86-0317-2081836